BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//SPE WA - ECPv6.18.3.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:SPE WA
X-ORIGINAL-URL:https://www.spe-wa.org
X-WR-CALDESC:Events for SPE WA
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Perth
BEGIN:STANDARD
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
TZNAME:AWST
DTSTART:20220101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Perth:20230621T170000
DTEND;TZID=Australia/Perth:20230621T190000
DTSTAMP:20230619T080501Z
CREATED:20230606T024158Z
LAST-MODIFIED:20230619T080501Z
UID:33088-1687366800-1687374000@www.spe-wa.org
SUMMARY:Digital Advanced Work Packaging – A case study in construction lead delivery
DESCRIPTION:Organised by Facilities Group\nAdvanced Work Packaging (AWP) is a project management methodology applied to the Viva Energy Gas Terminal Project in Geelong\, Victoria. AWP is focused on driving efficiency by promoting alignment between Engineering\, Procurement and Construction. \nPath of Construction (PoC) arranges the CWAs and CWPs into a sequence that drives project execution and high-level deliverable planning. The PoC is the basis for the Level III schedule. \nSimilar to the CWAs\, the PoC is established early in the Project\, typically in the FEED phase. The PoC is modified to align with the design development \nGerard Van Den Broek\n(Director of Construction APAC\, Worley)\nGerard has over 30 years of experience delivering complex multi-billion-dollar projects in mining\, oil\, gas\, energy & chemicals. His experience ranges from various stages of studies (feasibility\, Pre-FEED\, FEED) to project delivery and commissioning of varying execution strategies including EPFC\, EPCM and EPC.  Gerard has worked globally across North America\, South East Asia\, Asia and Australia across a range of commodities in mining including copper\, bauxite\, nickel\, and across chemicals\, ethylene\, ammonia\,  explosives\, energy & renewables\, shipbuilding and rail infrastructure \nAbout the Event\nPrice: \n\nSPE Member $10\nNon-Member $15\n\nBring a friend for free\, but it must be in the same registration.\nAdd your friend’s name to the field “Additional Guest Name” on the checkout page. \nDate:             Wednesday 21st of June 2023 \nLocation:      Flux Basement\, 191 St Georges Terrace\, Perth WA \nTime: \n\n4:45 pm – 5:00 pm Registration and Networking\n5:00 pm – 5:45 pm Presentation and Q&A Session\n5:45 pm – 6:45 pm Networking Drinks & Nibbles
URL:https://www.spe-wa.org/event/digital-advanced-work-packaging-a-case-study-in-construction-lead-delivery/
LOCATION:Flux Basement\, 191 St Georges Terrace\, Perth\, WA 6000\, 191 St Georges Terrace\, Perth\, Western Australia\, 6000\, Australia
CATEGORIES:Facilities Group
ATTACH;FMTTYPE=image/jpeg:https://www.spe-wa.org/wp-content/uploads/2023/06/Blue-Dark-Professional-Geometric-Business-Project-Presentation-1.jpg
END:VEVENT
END:VCALENDAR