BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//SPE WA - ECPv6.18.0//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:SPE WA
X-ORIGINAL-URL:https://www.spe-wa.org
X-WR-CALDESC:Events for SPE WA
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Shanghai
BEGIN:STANDARD
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
TZNAME:CST
DTSTART:20150101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20160216T160000
DTEND;TZID=Asia/Shanghai:20160216T180000
DTSTAMP:20160129T063312Z
CREATED:20160129T063332Z
LAST-MODIFIED:20160129T063312Z
UID:1500-1455638400-1455645600@www.spe-wa.org
SUMMARY:OGFG - February Technical Talk. Disruption in Field Development – From a Nice to Have to a Have to Have.  Some Case Histories of How We Engineered It.
DESCRIPTION:Disruption in Field Development – From a nice to have to a have to have.  Some case histories of how we engineered it.  By Rodney Silberstein\,  from ARV Offshore. \nChallenges to field development economics are not new to oil & gas developments. Even in high price markets\, ensuring profits in low production outcome scenarios requires innovative approaches and most commonly we do things differently only when we have to. The fear is that doing things differently will turn out to cost more\, not less\, and usually we hear only about the problems. \nSuccess stories of a number of developments are presented\, in which step change to cost has been achieved and was not derailed by an over-looked detail. In many cases\, some enabling breakthrough technology has been developed\, made possible by a supportive working and contractual environment. These technologies include pipeline stabilisation\, platform installation\, mooring systems and\, above all\, include a great understanding of the life cycle of design through construction to operation and decommissioning. \n \nAbout Rodney Silberstein\, he is an engineer with a 30+ years career evenly split between design (mostly JPKenny)\, operation (mostly Unocal) and construction (mostly ARV).  He grew up in Perth\, receiving a B Eng. in Civil Engineering in 1980 and commenced work with 4 years at the Public Works Dept. (PWD)\, designing marine structures and building water supply and sewerage systems (think of him next time you’re using the Margret River scheme).  Like many other West Aussies\, he went to London for 2 years and entered the offshore oil & gas sector with Brown & Root (UK)\, followed by formative 11 years with JPKenny\, starting with 5 others in Perth in 1984.  His career path took him to Sydney and later Bangkok\, where he joined Unocal Thailand to redesign the facilities in the Gulf of Thailand.  In 2005 he left to set up ARV Offshore and 5 years later returned to Perth for the Australian version.  During this career he has gravitated towards the challenging\, marginal\, innovative projects to apply engineering and commercial drivers to optimise the solutions. \n \nThanks to our sponsor
URL:https://www.spe-wa.org/event/oil-and-gas-facilities-group-november-technical-evening/
LOCATION:Mia Yellagonga (Woodside)\, 11 Mount St\, Perth\, Western Australia\, 6000\, Australia
CATEGORIES:Facilities Group
ORGANIZER;CN="Julie Morgan":MAILTO:JULIE.MORGAN1@woodside.com.au
END:VEVENT
END:VCALENDAR