Loading Events

« All Events

Postponed

Well Decommissioning Surface and Subsea Wellheads – Phase 3 and Phase 2

August 22 @ 12:00 pm - 1:00 pm

Free

Synopsis: 

  • Discussion of Phase 3 of Well Abandonment involving the removal of the Subsea Wellhead and Cutting & Retrieving of Conductor String from below the seabed for wells with dry trees.
  • Brief discussion of Phase 2 of Well Abandonment where intermediate zones with flow potential is isolated
  • Proposal for deviating from the norm when recovering Subsea Wellheads.

 Speaker profile : Edwin Damasena

  • Drilling professional with over 40 yrs industry experience
  • 13 yrs as staff engineer in Europe then as a consultant working in Australia/South America/India/Myanmar/Thailand/Indonesia/Malaysia
  • Positions held Drilling Superintendent, Drilling Manager, Lead Drilling Engineer, Drilling Supervisor/Well Technology Manager and Base Manager
  • Floating drilling, Jack Up and Platform drilling. Land drilling including in remote desert and bushland area.

Details

Date:
August 22
Time:
12:00 pm - 1:00 pm
Cost:
Free
Event Category:

Organiser

SPE WA Young Professionals
Email:
speyoungprofessionalswa@gmail.com

Venue

240 St. Georges Terrace, Level 1 Wood Offices
240 St. Georges Terrace, Level 1 Wood Offices
Perth, WA 6000 Australia
+ Google Map

RSVP

10 Going
10 remaining, 2 days left to RSVP
RSVP Here
Scroll to Top