Digital Advanced Work Packaging – A case study in construction lead delivery
June 21 @ 5:00 pm - 7:00 pm
$10.00 – $15.00
Organised by Facilities Group
Advanced Work Packaging (AWP) is a project management methodology applied to the Viva Energy Gas Terminal Project in Geelong, Victoria. AWP is focused on driving efficiency by promoting alignment between Engineering, Procurement and Construction.
Path of Construction (PoC) arranges the CWAs and CWPs into a sequence that drives project execution and high-level deliverable planning. The PoC is the basis for the Level III schedule.
Similar to the CWAs, the PoC is established early in the Project, typically in the FEED phase. The PoC is modified to align with the design development
Gerard Van Den Broek
(Director of Construction APAC, Worley)
Gerard has over 30 years of experience delivering complex multi-billion-dollar projects in mining, oil, gas, energy & chemicals. His experience ranges from various stages of studies (feasibility, Pre-FEED, FEED) to project delivery and commissioning of varying execution strategies including EPFC, EPCM and EPC. Gerard has worked globally across North America, South East Asia, Asia and Australia across a range of commodities in mining including copper, bauxite, nickel, and across chemicals, ethylene, ammonia, explosives, energy & renewables, shipbuilding and rail infrastructure
About the Event
Price:
- SPE Member $10
- Non-Member $15
Bring a friend for free, but it must be in the same registration.
Add your friend’s name to the field “Additional Guest Name” on the checkout page.
Date: Wednesday 21st of June 2023
Location: Flux Basement, 191 St Georges Terrace, Perth WA
Time:
- 4:45 pm – 5:00 pm Registration and Networking
- 5:00 pm – 5:45 pm Presentation and Q&A Session
- 5:45 pm – 6:45 pm Networking Drinks & Nibbles